Coiled tubing machinery

You are here

Region Company was the first company to introduce the coiled tubing technology in Ukraine.

The most progressive way of wells lifting and servicing. The history of its application in the world began more than 35 years ago. In Ukraine, the technology of coil tubing use appeared only a short time ago.

The main coiled tubing advantages in combination with nitrogen units use are efficiency and operating speed, compared with traditional methods of wells servicing and stimulation that provides a guaranteed quality of work.

Industry is the soul of business and the keystone of prosperity
by Charles Dickens

Coiled Tubing Unit СТU-1

Vita International, Inc, USA. 2000 Viking trailer mounted

Coiled Tubing Unit СТU-1

Vita International, Inc, USA

2000 Viking trailer mounted;

Max. well depth – 3900 m;

Tubing diameter – 32 mm;

Max. injection pressure – 35 Mpa;

Injector head max. pull capacity – 18 t

CT speed - 1,5 m/min. to 20 m/min

Blowout Preventer:

Process pressure:

  • operating: 70 Mpa
  • test: 105MPa

Coiled Tubing Unit Hydra Rig

USA. Skid-mounted unit.

Coiled Tubing Unit

Hydra Rig, USA

Skid-mounted unit

Max. well depth – 6000 m;

Tubing diameter – 38 mm;

Max. injection pressure – 70 Mpa;

Injector head max. pull capacity – 27 t

CT speed - 1,5 m/min. to 50 m/min


Blowout Preventer:

Process pressure:

  • operating: 70 Mpa
  • test: 105MPa

Coiled Tubing Unit Stewart&Stevenson

USA. Mounted on a Mercedes Benz truck chassis.

Coiled Tubing Unit
Stewart&Stevenson, USA:

Mounted on a Mercedes Benz truck chassis;

Max. well depth – 5 000 m;

Tubing diameter – 32 mm;

Max. injection pressure – 35 Mpa;

Injector head max. pull capacity – 20 t

CT speed - 1,5 m/min. to 20 m/min


Blowout Preventer:

Process pressure:

  • operating: 70 Mpa
  • test: 105MPa

Coiled Tubing Unit B&G-001 B&G

USA. B&G trailer mounted.

Coiled Tubing Unit B&G-001
B&G, USA

B&G trailer mounted

Max. well depth – 6100 m;

Tubing diameter – 38 mm;

Max. injection pressure – 70 Mpa;

Injector head max. pull capacity – 27 t

CT speed - 1,5 m/min. to 50 m/min


Blowout Preventer:

Process pressure:

  • operating: 70 Mpa
  • test: 105MPa