Coiled tubing machinery
You are here
Region Company was the first company to introduce the coiled tubing technology in Ukraine.
The most progressive way of wells lifting and servicing. The history of its application in the world began more than 35 years ago. In Ukraine, the technology of coil tubing use appeared only a short time ago.
The main coiled tubing advantages in combination with nitrogen units use are efficiency and operating speed, compared with traditional methods of wells servicing and stimulation that provides a guaranteed quality of work.
Coiled Tubing Unit СТU-1
Coiled Tubing Unit СТU-1
Vita International, Inc, USA
2000 Viking trailer mounted;
Max. well depth – 3900 m;
Tubing diameter – 32 mm;
Max. injection pressure – 35 Mpa;
Injector head max. pull capacity – 18 t
CT speed - 1,5 m/min. to 20 m/min
Blowout Preventer:
Process pressure:
- operating: 70 Mpa
- test: 105MPa
Coiled Tubing Unit Hydra Rig
Coiled Tubing Unit
Hydra Rig, USA
Skid-mounted unit
Max. well depth – 6000 m;
Tubing diameter – 38 mm;
Max. injection pressure – 70 Mpa;
Injector head max. pull capacity – 27 t
CT speed - 1,5 m/min. to 50 m/min
Blowout
Preventer:
Process pressure:
- operating: 70 Mpa
- test: 105MPa
Coiled Tubing Unit Stewart&Stevenson
Coiled Tubing
Unit
Stewart&Stevenson,
USA:
Mounted on a Mercedes Benz truck chassis;
Max. well depth – 5 000 m;
Tubing diameter – 32 mm;
Max. injection pressure – 35 Mpa;
Injector head max. pull capacity – 20 t
CT speed - 1,5 m/min. to 20 m/min
Blowout
Preventer:
Process pressure:
- operating: 70 Mpa
- test: 105MPa
Coiled Tubing Unit B&G-001 B&G
Coiled Tubing
Unit B&G-001
B&G, USA
B&G trailer mounted
Max. well depth – 6100 m;
Tubing diameter – 38 mm;
Max. injection pressure – 70 Mpa;
Injector head max. pull capacity – 27 t
CT speed - 1,5 m/min. to 50 m/min
Blowout
Preventer:
Process pressure:
- operating: 70 Mpa
- test: 105MPa