"Region" renders services on hydraulic jet perforation, using methods of traditional tubing conveyed perforation and small-diameter CT unit for perforating operations.
During hydraulic jet perforation sand-fluid mixture is delivered into the coiled tubing – gushing from a perforation nozzle, it formulates a highly abrasive jet that can easily penetrate into the slot in one or more cemented casings. Typical sand concentration in the mixture is 30-60 kg/m3. Unlike conventional cumulative perforation, hydraulic jet perforation allows for more effective connection with the layer and deeper perforation channeling. It also significantly reduces the production string exposure to impact loading that is critical in case of poor casing cementing.
Typical performance parameters are stated in the following table:
№
Parameters
Tubing conveyed perforation (TCP)
Coiled-tubing (CT) perforation
№
№
Parameters
Parameters
Tubing conveyed perforation (TCP)
Tubing conveyed perforation (TCP)
Coiled-tubing (CT) perforation
Coiled-tubing (CT) perforation
1
Number of concurrent perforations
2
1-2
№
1
Parameters
Number of concurrent perforations
Tubing conveyed perforation (TCP)
2
Coiled-tubing (CT) perforation
1-2
2
Number of perforations per meter
4
2-4
№
2
Parameters
Number of perforations per meter
Tubing conveyed perforation (TCP)
4
Coiled-tubing (CT) perforation
2-4
3
Maximum allowable number of perforations per one trip operation
20-40
36
№
3
Parameters
Maximum allowable number of perforations per one trip operation
Tubing conveyed perforation (TCP)
20-40
Coiled-tubing (CT) perforation
36
4
Number of pumping units involved
2-4
1
№
4
Parameters
Number of pumping units involved
Tubing conveyed perforation (TCP)
2-4
Coiled-tubing (CT) perforation
1